BLOG

Emlid official blog

Emlid at INTERGEO 2026: new gear, live demos, and insights on scaling your workflows

Emlid at INTERGEO 2026: new gear, live demos, and insights on scaling your workflows

Join us in Munich from September 15–17 for INTERGEO 2026—the world’s premier gathering for geodesy, geoinformation, and land management. 

How ASCE 38 quality levels work with RTK GNSS for utility mapping

How ASCE 38 quality levels work with RTK GNSS for utility mapping

ASCE 38 defines four Quality Levels for documenting existing underground utilities, from existing records to physical exposure. This guide breaks down what each level means.

The utility trench as-built survey checklist: what reviewers look for before they approve

The utility trench as-built survey checklist: what reviewers look for before they approve

A short, predictable list of reasons gets most utility as-built surveys rejected. Here’s the checklist reviewers use, and how to pass on the first try.

Reach receivers now have built-in RTK corrections 

Reach receivers now have built-in RTK corrections 

Skip the base station and NTRIP setup. Emlid Corrections delivers 1–2 cm accuracy through your Reach receiver, with a free first year included.

Customer story: what happens when superintendents get survey-grade tools

Customer story: what happens when superintendents get survey-grade tools

CORE Construction hands GNSS receivers straight to superintendents, letting them verify layouts on-site before problems turn into rework.

IMU tilt compensation in surveying: how to improve productivity without sacrificing accuracy

IMU tilt compensation in surveying: how to improve productivity without sacrificing accuracy

Tilt the pole, skip the bubble level, still get the right coordinate. Here’s how IMU tilt compensation works, what affects its accuracy, and when to use it in the field.

Customer story: How Dellbrook cut rework on the job site with GNSS for superintendents

Customer story: How Dellbrook cut rework on the job site with GNSS for superintendents

How Dellbrook, a New England construction management firm, closed the gap between subcontractor layout and verification—one job-costed Emlid receiver at a time.

Earthworks planning and progress tracking: staying on grade, on schedule and on budget

Earthworks planning and progress tracking: staying on grade, on schedule and on budget

The design said 5,000 m³. The site needed 7,000. Here’s how to set up earthworks planning and progress tracking so the gap shows up on site, not on the invoice.

How to switch your team to a new GNSS receiver fast and friction-free

How to switch your team to a new GNSS receiver fast and friction-free

Switching GNSS vendors can unlock better margins, faster field work, and happier crews—if you get the adoption strategy right.

As-built surveys: a field-to-office workflow with Emlid Reach receivers

As-built surveys: a field-to-office workflow with Emlid Reach receivers

An as-built survey records the final position, dimensions, and elevation of finished structures before they’re covered or handed over. This guide walks the full workflow with Reach receivers, Emlid Flow, and Emlid Flow 360.