BLOG

Emlid official blog

How to run fast and error-free underground utility projects with GNSS

How to run fast and error-free underground utility projects with GNSS

Underground utilities are the one part of a job you can’t fix without a shovel. GNSS handles stakeout, grade verification, and as-built capture on the same project—so your crew doesn’t have to choose between moving fast and getting the record right.

Customer Story: Accurate drone mapping with an Emlid Reach RS4 Pro base

Customer Story: Accurate drone mapping with an Emlid Reach RS4 Pro base

3DroneMapping’s BESSIE VTOL drone was built for the kind of missions most platforms can’t handle — vast, remote, and unforgiving terrain across Africa. To match that ambition, they needed a GNSS setup that wouldn’t let them down.

Tape measure vs. GPS in construction: when to upgrade your layout workflow?

Tape measure vs. GPS in construction: when to upgrade your layout workflow?

Understand tape measure vs. GPS for construction layout: four places a tape fails, and what GPS RTK does instead.

Customer story: high-speed water infrastructure layouts and as-builts with Emlid

Customer story: high-speed water infrastructure layouts and as-builts with Emlid

Garney Construction is rethinking field work across its US water and wastewater projects. Construction Technology Manager breaks down what’s changing: syncing the office and field, and doing fewer trips into the trench.

How to manage 10,000+ construction surveying projects and structure data at scale

How to manage 10,000+ construction surveying projects and structure data at scale

At 10,000+ construction jobs a year, manual data handoffs cost you time and accuracy. Here’s how to structure a workflow that scales.

Customer story: scaling earthworks and utility projects with GNSS for construction

Customer story: scaling earthworks and utility projects with GNSS for construction

See how KLS Earthworks used GNSS for construction to scale to 60 active sites. By equipping supervisors with Emlid rovers, they eliminated layout delays and boosted field autonomy.

QA/QC workflows in construction: a practical guide for your field crew

QA/QC workflows in construction: a practical guide for your field crew

Catching errors early is what separates efficient construction projects from costly rework. This guide breaks down how field crews can take control of QA/QC workflows—and keep projects moving without delays.

RTK corrections delivery method explained: how to choose the right setup?

RTK corrections delivery method explained: how to choose the right setup?

Choosing the right RTK correction delivery method affects your accuracy, reliability, and workflow. This guide breaks down radio, NTRIP, and CORS options to help you find the best setup for your field conditions.

Zero rework: how construction subcontractors win with GNSS

Zero rework: how construction subcontractors win with GNSS

More subcontractors are picking up RTK GNSS receivers and doing positioning work in-house. Not to replace their surveyor—but to stop depending on them for every routine check. Here’s what that looks like across five trades.

Minimize construction site visits: how to support your field crew remotely

Minimize construction site visits: how to support your field crew remotely

Construction teams often lose hours driving to site for questions that take minutes to answer. See how Emlid Flow and Flow 360 connect field crews and office teams in real time to reduce site visits and speed up decisions.