BLOG

Emlid official blog

How Fyfe supervises its 40-surveyor team from the office with Emlid Flow 360

How Fyfe supervises its 40-surveyor team from the office with Emlid Flow 360

Fyfe’s registered surveyors supervise a team of 40 field surveyors working on remote sites. With Emlid Flow 360, each point taken in the field reaches the office almost straight away, so they can check the work without driving hours to site.

Simple enough for non-surveyors: how Hausmann Construction’s superintendents run Emlid’s GNSS

Simple enough for non-surveyors: how Hausmann Construction’s superintendents run Emlid’s GNSS

Hausmann Construction has 40–50 active projects and no surveyors on staff. See how its superintendents now handle layout themselves with the Reach RX2.

Earthworks planning and progress tracking: staying on grade, on schedule and on budget

Earthworks planning and progress tracking: staying on grade, on schedule and on budget

The design said 5,000 m³. The site needed 7,000. Here’s how to set up earthworks planning and progress tracking so the gap shows up on site, not on the invoice.

How to switch your team to a new GNSS receiver fast and friction-free

How to switch your team to a new GNSS receiver fast and friction-free

Switching GNSS vendors can unlock better margins, faster field work, and happier crews—if you get the adoption strategy right.

As-built surveys: a field-to-office workflow with Emlid Reach receivers

As-built surveys: a field-to-office workflow with Emlid Reach receivers

An as-built survey records the final position, dimensions, and elevation of finished structures before they’re covered or handed over. This guide walks the full workflow with Reach receivers, Emlid Flow, and Emlid Flow 360.

Three places construction projects lose money and how GNSS helps close the gap

Three places construction projects lose money and how GNSS helps close the gap

On most projects, profit doesn’t vanish in one big loss. It leaks out in small moments: a measurement that’s off, a crew standing around, a quantity you can’t prove. Here’s where it happens and how GNSS helps you catch each one before it costs you.

Managing cut and fill: a field guide to grade control using Reach receivers and Emlid Flow

Managing cut and fill: a field guide to grade control using Reach receivers and Emlid Flow

Before any structure goes up, the ground has to match the design. Here’s how crews use RTK GNSS and Emlid Flow to manage cut and fill in real time, across building pads, road alignments, utility trenches, and more.

Customer story: high-speed water infrastructure layouts and as-builts with Emlid

Customer story: high-speed water infrastructure layouts and as-builts with Emlid

Garney Construction is rethinking field work across its US water and wastewater projects. Construction Technology Manager breaks down what’s changing: syncing the office and field, and doing fewer trips into the trench.

QA/QC workflows in construction: a practical guide for your field crew

QA/QC workflows in construction: a practical guide for your field crew

Catching errors early is what separates efficient construction projects from costly rework. This guide breaks down how field crews can take control of QA/QC workflows—and keep projects moving without delays.

Minimize construction site visits: how to support your field crew remotely

Minimize construction site visits: how to support your field crew remotely

Construction teams often lose hours driving to site for questions that take minutes to answer. See how Emlid Flow and Flow 360 connect field crews and office teams in real time to reduce site visits and speed up decisions.